1. Overview
The Resource Gantt view provides a graphical overview of production scheduling, resource allocation, and machine utilization over time.
The Gantt chart helps planners and production managers:
- Visualize production operations
- Monitor machine and human resource workloads
- Detect overlaps and bottlenecks
- Analyze scheduling status
- Review Frozen Zone operations
- Monitor delay and planning status
The view supports:
- Daily, weekly, and monthly planning
- Multiple resource types
- Interactive operation details
- Frozen Zone management
- Capacity planning visualization
2. Filter and View Options
At the top of the screen, the following filters are available:
Period
Defines the planning horizon displayed in the Gantt chart.
Example:
- From: 2026.05.01
- To: 2026.07.31
Resource Type
Filters the displayed resources.
Possible examples:
- All
- Machines
- Human Resources
- Tools
View
Defines the timeline scale of the Gantt chart.
Possible views:
- Day
- Week
- Month
3. Gantt Structure
The left side of the chart displays:
- Production orders
- Assigned resources
- Machines
- Human resources
The right side displays:
- Scheduled operations
- Duration of operations
- Timeline positioning
- Capacity usage
Each horizontal bar represents a scheduled production operation.
4. Operation Information
When moving the mouse over a scheduled operation, the system displays detailed information such as:
- Production order name
- Product
- Quantity
- Assigned resource
- Start date and time
- End date and time
- Duration
- Deadline
- Delay status
- Frozen Zone status
This allows quick analysis without opening the operation manually.
5. Frozen Zone Explanation
The striped (hatched) operations indicate that the production task is currently inside the Frozen Zone.
The Frozen Zone is a protected planning period where the system does not automatically modify scheduled operations.
This means:
- The operation is fixed in the schedule
- Automatic replanning is disabled
- The planning engine skips these operations during optimization
- The start and end dates remain unchanged
Operations inside the Frozen Zone are considered stable and released for production execution.
6. How Frozen Zone Works
When an operation has Frozen Zone status:
- The APS scheduling engine does not move the task
- Capacity optimization ignores the operation
- Automatic rescheduling is blocked
- Production planners must manually remove the Frozen Zone flag if changes are required
This functionality protects short-term production schedules from unexpected automatic modifications.
7. Visual Representation of Frozen Zone
In the Gantt chart:
- Striped / hatched bars = Frozen Zone active
- Normal solid bars = Fully schedulable operations
The Frozen Zone status is also visible in the tooltip information of the operation.
8. Why Frozen Zone is Important
The Frozen Zone helps:
- Stabilize production planning
- Protect released production orders
- Prevent unnecessary schedule changes
- Improve shop floor reliability
- Ensure production continuity
- Reduce planning instability
This is especially important for:
- Near-term production
- Critical manufacturing operations
- Operations already in progress
- Customer-critical orders
9. Additional Planning Features
The Resource Gantt also supports:
- Capacity utilization analysis
- Delay visualization
- Operation sequencing
- Resource load balancing
- Downtime analysis
- OEE-related planning review
10. Important Notes
- Operations outside the Frozen Zone can still be optimized automatically.
- Frozen Zone operations require manual intervention for rescheduling.
- The planning engine respects Frozen Zone restrictions during every scheduling run.
- Frozen Zone status improves production stability and execution reliability.